2007 August/September The New Kitchen
First we had to remove everything from the kitchen cupboards.
The good Dr. T helped a lot with this.
It was all assembled in the living room.
Sallie likes bum shots.
The fridge was moved too. It now lives in the garage.
After all was moved, Peter and Sallie relaxed.
Fortunately the fridge still contained beer.
You find the strangest things when you move everything.
Lots of plastic did not save us from the construction dust.
All ready for the beginning of work.
Microwave ready to go.
Last minute check on the beer in the fridge.
The big hole in the wall begins, Kevor and Berj seem pleased with it so far.
The hole gets bigger.
And bigger.
First paint job complete.
With the second paint job done, Sallie is pleased with the new hole in the wall.
The floor is prepared for the new covering.
More prepared floor.
Still more prepared flooring.
The floor is in!
Ta DA! Jim is pleased with his work.
Sallie is also pleased with the colour selection.
The hole in the wall is complete.
Job done.... and we even paid him!
Sallie checks out the new kitchen breakfast spot.
This corner now contains shelves and a computer spot.
New washer and drier goes in. Note the absence of the hot water heater.
In comes the new stove and fridge.
Theo loves the new stove, and Jason and Martin were a big help.
Back to album index